Abbot Point X50 Upgrade – Sun Engineering
Client: Sun Engineering
Scope: Abbot Point X50 Upgrade.
Weight: 450 tonne structural steel, mechanical and plate.
Extract from news article in August 2010:
“SABBOT POINT X 50 UPGRADE STRUCTURAL, MECHANICAL AND PLATEWORK SHOP DETAILING AWARDED TO SDE CONSULTING FROM SUN ENGINEERING
Sun Engineering has awarded SDE CONSULTING ASIA PTY the shop detailing for the complete structural, mechanical and plate work associated with the upgrade of the rail unloader and transfer towers 1, 2 and 3. This is a substantial project for SDE CONSULTING ASIA PTY to complete within a tight timeframe. SDE CONSULTING ASIA PTY is looking forward to working with Sun Engineering on this prestigious project and this will further enhance SDE CONSULTING ASIA PTY's reputation as a leading structural and mechanical shop detailer. This project includes over 450 tonnes of structural, mechanical and plate work.”
Abbot Point X 50 Upgrade Rail Unloader 3D.pdf
Abbot Point X 50 Upgrade Tranfer Tower TT1 3D.pdf